Customization: | Available |
---|---|
Material: | Steel |
Type: | Fixed |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Scaffold prop U-shaped fork head for formwork H20 Beam
1. Forkhead is a 4 way u head assemble at the top of prop, used to hole H20 timber beam.
2. Forkhead is made of steel sheet with 4pcs of angle iron and a steel round tube, the angle iron usually have drilled holes for nailing the fork timeber beam.
3. Forkhead can also be used with other types of modular scaffolding systems to support various sizes of timber batten.
Name
|
U-Fork head
|
Weight
|
2.4KG
|
Material
|
Q235 Steel
|
Surface Treatment
|
Ele-gal / Painted / Black
|
Packing
|
Wood pallet
|